Quantcast
Channel: Main Sequence Software - Latest topics
Viewing all articles
Browse latest Browse all 8550

Power control at beginning and end of sequence

$
0
0

@buzz wrote:

I have just written an ASCOM switch driver for a 4-way relay and I am thinking of deploying it before and after a sequence. I can see in the sequence options that I can potentially run an end of sequence script to remove power (I assume the script is executed after any disconnect devices action) but I was wondering of the possibility of executing a power-on script before SGP tries to connect all the devices, and in the case of a timed sequence start, only powering up and connecting say 10 minutes say ahead of the sequence kicking off in earnest.

I don't think that possibility exists at the moment, hence posting it under feature requests. What do you think?

Posts: 1

Participants: 1

Read full topic


Viewing all articles
Browse latest Browse all 8550

Trending Articles