@buzz wrote:
I have just written an ASCOM switch driver for a 4-way relay and I am thinking of deploying it before and after a sequence. I can see in the sequence options that I can potentially run an end of sequence script to remove power (I assume the script is executed after any disconnect devices action) but I was wondering of the possibility of executing a power-on script before SGP tries to connect all the devices, and in the case of a timed sequence start, only powering up and connecting say 10 minutes say ahead of the sequence kicking off in earnest.
I don't think that possibility exists at the moment, hence posting it under feature requests. What do you think?
Posts: 1
Participants: 1